Patience

In the past I worked in an environment that had a very fast development pace which created high stress and, ultimately, some developer turnover.  My current job is not like that at all and this is both good (for me) and bad (for deadlines).

We have only a small team (2 .NET developers, 2 green screen developers and 1 technical writer), but so did my last job.  At that place I managed a complete rewrite and documentation of the inventory module's UI, and the creation of a fully featured windows control that graphically represented the inventory environment, in under 2 months.

I rolled into this new team with the work ethic and urgency that I was accustomed to from the past and, in the first month, created a database driven reporting environment from scratch.  This was quite involved as it has all information about the selection criteria, data gathering (queries) and report configurations, stored in the database.  In that time I even created functionality that allowed for database defined, event driven filtering of selection criteria, plus the ability for hyperlinks in reports to open secondary reports with linked data.  The whole module was a challenge considering I had to do an internal business analysis of the software's needs, train management on the ways of modern reporting tools, learn DataDynamic's Active Reports for .NET (I've been a Crystal developer in the past) and I had to create reports for a convention at the end of that one month period.  Still, I did this without any overtime.  Since the rollout for the convention, I've finished up the reports that were required and I've created a rather nice admin tool for configuring the reporting system.

This week was rather slow and I noticed that slow is the pace set by the other .NET developer.  Sure I don't know what other forces are at work during that individual's work day, but you should be able to make some progress on the main project.  In the past 2 to 3 weeks all that that developer has done for the project is create the data shema for the Inventory module.  At this pace, if all they did was create schemas, we'd have the data structure for the system drawn up sometime around the end of May.  Remember, that would include no UI or datalayer programming, and the targeted release time is October or November of this year!

All in all, I'm not stressed about work anymore, but I sure don't get anything done there.

posted @ Saturday, February 12, 2005 3:50 AM

Print
Comments have been closed on this topic.